New driveways and full replacements
Asphalt Driveway Paving in Wichita, KS
A driveway is only as good as the ground under it, so the work starts with the subgrade and the base.
- Free on-site estimates
- Written, itemized quote before any work
- Subgrade and base checked before new asphalt goes down
Building a Driveway That Holds Up
Asphalt driveway paving is mostly groundwork. The black surface you see is a few inches thick; under it sits a compacted gravel base and, below that, native soil. When a Wichita driveway breaks up into alligator cracks, sinks near the garage or crumbles along the lawn, the cause is usually a weak base, wet subgrade or water that has nowhere to go. A new driveway fixes those causes first.
Signs your driveway needs replacing
- Cracks that connect into a pattern like alligator skin
- Potholes that return after patching
- Sunken areas where water stands after rain
- Edges breaking off into the yard
- More patch than original surface
A few isolated cracks can be sealed and a small failed area can be patched. When the problems cover much of the driveway, replacement usually costs less over time than repeated repairs.
Working with clay soil
Clay-rich soils are common across Sedgwick County. USDA soil maps for parts of the county show silty clays rated in the slowest-draining hydrologic group, so water lingers in the ground after storms. Wet clay is soft, and it moves as it swells and dries. We remove soft subgrade we find, replace it with compacted crushed stone, and grade the base so the finished surface sheds water toward the yard or the street rather than toward the garage.
Thickness and materials
Cost guides describe a typical residential build as 2 to 3 inches of compacted asphalt over 6 to 8 inches of compacted gravel, with more of each for driveways that carry heavy trucks or trailers. Your quote states the base depth and the asphalt thickness so you can compare bids on the same terms. Asphalt is placed hot, spread with a paver where access allows, and compacted with a roller while it is still workable.
The garage slab and the curb apron
Two transitions decide how a driveway looks and drains: the joint at the garage slab and the joint at the street. At the garage we taper the asphalt so it meets the slab cleanly without a lip. At the street, many Wichita homes have a concrete drive approach in the public right-of-way. The city code as adopted in 2016 requires a permit from the City Engineer for drive approach work, generally calls for approaches to be concrete, and treats widening or replacing a drive as a new approach. Rules can change, so if your project reaches that area, we check the current requirements with the city and explain the process at the estimate before anything is planned.
Seasons and scheduling
Wichita's average freeze window runs from late October to early April. Paving on cold ground makes it hard to compact the mix before it stiffens, so new driveways are best placed from late spring into fall. In July and August we plan around afternoon heat, and we ask you to keep cars off the new surface until it has cooled and set.
Caring for a new driveway
New asphalt stays somewhat soft for its first season, especially in a Kansas summer. Avoid turning the steering wheel while parked, vary where you park, and put a board under motorcycle kickstands or trailer jacks. Sealcoating should wait until the asphalt has cured, usually several months. After that, sealing every few years and filling cracks before winter protect the investment.
What This Covers
A driveway job covers everything from removing the old surface to the finished edges.
Tear-out and haul-off
Old asphalt, concrete or gravel removed and hauled away.
Subgrade and base repair
Soft clay dug out and replaced, then compacted crushed stone graded for drainage.
New hot-mix asphalt
Placed and rolled to the compacted thickness written in your quote.
Edges and transitions
Tapered joints at the garage slab, sidewalk and curb apron.

Typical Asphalt Driveway Costs
| Item | Published national range |
|---|---|
| New asphalt driveway (HomeGuide) | $5 to $12+ per sq ft |
| New asphalt driveway (Angi) | $7 to $15 per sq ft |
| 20 x 20 ft driveway, 400 sq ft (HomeGuide) | $2,000 to $4,800 |
| 1,000 sq ft driveway (HomeGuide) | $5,000 to $12,000 |
| Remove and replace a driveway (Angi) | $8 to $15 per sq ft |
| Driveway permits (Angi) | $50 to $200 |
National ranges from HomeGuide and Angi; each guide builds its numbers its own way, so the ranges do not line up. Some contractors set a minimum charge. Prices in Wichita can differ from national averages, and removal, soft-soil repair, slope and approach work move the total up or down. The figure on your written estimate is what you pay.
How It Works
1. Site visit
We measure, check slope and drainage, probe soft spots and look at the curb apron.
2. Written quote
Removal, base depth, asphalt thickness and edges are itemized with prices.
3. Base work
Old surface removed, soft subgrade replaced, stone base graded and compacted.
4. Paving
Hot asphalt placed and rolled, edges finished, and care instructions given.

Asphalt Driveway Paving Questions
What is the price range for a driveway replacement in Wichita?
Published national ranges run about $5 to $12 or more per square foot (HomeGuide) and $7 to $15 per square foot (Angi). A 400-square-foot driveway lands around $2,000 to $4,800 in HomeGuide's figures. Tear-out, base repair and access change the total, and we give you a written price after the site visit.
Should I choose asphalt or concrete for a Kansas driveway?
Either can be a good choice. Asphalt is generally cheaper up front and flexes a little with freeze-thaw movement, but it needs sealing every few years. Concrete costs more and lasts longer, but cracks it develops are harder to repair invisibly. Your budget, slope and how long you plan to stay all factor in.
Can you widen my driveway?
Yes, on your property. If widening also means a wider curb cut, Wichita's code as adopted in 2016 treats that as a new drive approach, which needs a City Engineer permit and generally a concrete approach no wider than 30 feet without written approval. The city may have updated those rules, so we check the current requirements and explain what is involved at the estimate.
How long before I can park on new asphalt?
Usually a few days for cars, longer in summer heat. Heavy vehicles, trailers and RVs should stay off it for longer. We give you specific timing for your job when the paving is done.
Why do some new driveways crack in the first winter?
Most early cracking comes from a thin or poorly compacted base, soft subgrade left in place, or water collecting along an edge. Those are the parts of the job we spend the most time on.
Asphalt Driveway Paving Service Areas
- Paving Contractors in Wichita, KS
- Paving Contractors in Derby, KS
- Paving Contractors in Haysville, KS
- Paving Contractors in Mulvane, KS
- Paving Contractors in Park City, KS
- Paving Contractors in Bel Aire, KS
- Paving Contractors in Kechi, KS
- Paving Contractors in Valley Center, KS
- Paving Contractors in Maize, KS
- Paving Contractors in Goddard, KS
- Paving Contractors in Cheney, KS
- Paving Contractors in Clearwater, KS
- Paving Contractors in Andover, KS
- Paving Contractors in Augusta, KS
- Paving Contractors in Rose Hill, KS
- Paving Contractors in El Dorado, KS
- Paving Contractors in Newton, KS
- Paving Contractors in Hutchinson, KS
- Paving Contractors in McPherson, KS
- Paving Contractors in Wellington, KS
- Paving Contractors in Winfield, KS
- Paving Contractors in Sedgwick, KS
- Paving Contractors in Halstead, KS
- Paving Contractors in Colwich, KS
Get a Asphalt Driveway Paving Estimate
Free estimates for asphalt driveways in Wichita and Sedgwick County.